Construction Cost Estimator
Calculate your building project costs based on area and unit price
/sq ft
5%
Estimated Total Cost
$0.00
Cost Breakdown
Base Construction Cost:
$0.00
Waste Allowance (0%):
$0.00
Total Estimated Cost:
$0.00
Formula Used
Total Cost = Built-up Area × Cost per Unit Area
With waste allowance: Total Cost = (Built-up Area × Cost per Unit Area) × (1 + Waste Percentage/100)